Concrete Calculator - Cubic Metres, Yards and Bags
Concrete calculator
Step by step
- Volume V = 4 m × 3 m × 10 cm = 1.2 m³
- Add waste 1.2 m³ × (1 + 10 / 100) = 1.32 m³
- Bags, rounded up 1,320 L ÷ 12 L = 110 → 110
The bag yield is printed on the bag; change it if yours differs. Weight assumes normal-weight concrete. Steps are counted as solid down to the ground.
How to calculate concrete
Concrete is ordered by volume, so every job comes down to multiplying the dimensions in the same unit and adding a margin for spillage and uneven ground.
Formula
Volume by shape
L, W and T are length, width and thickness; D and H are the diameter and height of a column; R and G are the height and depth of one step and n is the number of steps. Convert centimetres or inches before multiplying: 10 cm is 0.1 m and 4 in is one third of a foot.
Waste
An allowance of 5 to 10 percent is common. Use the higher figure when concrete is poured directly on soil or when the formwork is irregular. Running short in the middle of a pour is worse than a small leftover.
Bags or ready-mix
Bags suit small pours. Because the count is always rounded up, the last bag may be only partly used. For larger volumes, compare the bag count with the minimum delivery of a ready-mix supplier.